
Layer 3: Correct! Notice how the pit was dug into deposit 2, filled with soil deposit 3, and then covered over with deposit 4.
Layer 3: Correct! Notice how the pit was dug into deposit 2, filled with soil deposit 3, and then covered over with deposit 4.
No comments:
Post a Comment